0
Gnee Rails Logo

WJ-7 Rail Fastening System

WJ-7 Rail Fastening System

The WJ-7 rail fastening system is a ballastless track fastener system developed to meet the technical requirements of the passenger dedicated line fastener system for laying various types of shoulderless ballastless tracks.

certificate

Additional information

Delivery Time

25-40 days, 7 days for stock goods

Loading Port

Shanghai ,Tianjin, Qingdao

Offer Ability

5000+pcs/Per Month

MOQ

100 Pcs

Packaging Details

Each woven bag is less than 25KG. Fumigation-free pallet. Customers can specify the method

Product Description

The WJ-7 rail fastening system is a ballastless track fastener system developed to meet the technical requirements of passenger dedicated line fastener systems for laying various types of shoulder-free ballastless tracks. It consists of track clamps, T-bolts, nuts and washers, track insulators, connecting plates, insulating buffer plates, track pads, anchor bolts, spring washers, flat washers and plastic pins.
This fastener system can be used on embedded sleepers (double-block sleepers and long sleepers) and slab ballastless tracks on bridges, tunnels and roadbeds.

railway equipment

Additional information

Delivery Time

25-40 days, 7 days for stock goods

Loading Port

Shanghai ,Tianjin, Qingdao

Offer Ability

5000+pcs/Per Month

MOQ

100 Pcs

Packaging Details

Each woven bag is less than 25KG. Fumigation-free pallet. Customers can specify the method

Specifications

High Speed WJ-7 Rail Fastening System

Item

Quantity

Material

Rail clip

2

60Si2MnA

T-bolt nut washer

2

Q235A

Rail insulator

2

PA66 Material

Tie plate

1

QT450-10

Insulated buffer plate

1

Rubber

Rail pad

1

EVA, or rubber

Anchor bolt

2

Q235A

Spring washer

2

60Si2Mn

Plain washer

2

QT450-10

Plastic dowel

2

Reinforced Nylon 66 (PA66)

Structure Features

This fastener system is a shoulder-free elastic split structure with iron pads, with the following structural features:

a) There is no concrete shoulder in the concrete sleeper or track slab bearing groove, and a 1:40 rail bottom slope is set on the iron pad. The concrete sleeper or track slab bearing surface is a flat slope. It can be used for both sleeper (double-block sleeper, long sleeper) buried ballastless track and track slab ballastless track. The lateral load transmitted by the train is mainly overcome by the friction of the iron pad.

b) A rubber pad is set between the rail bottom and the iron pad to achieve the elasticity of the system. By replacing the rail pads with different stiffness, it can adapt to the operating conditions of 350 km/h passenger dedicated line and 250 km/h passenger dedicated line (taking into account freight) respectively.

c) The iron pad is provided with a T-bolt insertion seat and a rail shoulder, and the elastic strip is tightened by tightening the nut of the T-bolt. The elastic clips designed in matching have a larger range than the existing elastic clips in my country (all kinds of elastic clips have a range of 14 mm), high fatigue strength, and small buckle pressure attenuation of the elastic clips when using a lower stiffness rail elastic pad.

d) An insulating block is provided between the rail shoulder and the rail on the iron pad to improve the insulation performance of the fastener system.

e) An insulating buffer pad is provided between the iron pad and the concrete sleeper or track plate to buffer the impact of the train load on the concrete sleeper or track plate, while improving the insulation performance of the system. The insulating buffer pad is provided with ribs around it and a drainage port is left, which can effectively improve the water film resistance.

f) The same iron pad can be installed with a variety of elastic clips (conventional buckle pressure elastic clips and small buckle pressure elastic clips), and different line resistances can be obtained by using rail pads with different friction coefficients (rubber pads or composite pads). It can be used in sections requiring large resistance and sections requiring small resistance, meeting the requirements for laying seamless lines under various line conditions.

g) The iron pad is fastened with the insulating sleeve pre-buried in the concrete sleeper or track plate through anchor bolts. The embedded sleeve is provided with a spiral reinforcement positioning hole to facilitate accurate positioning of the spiral reinforcement. The embedded sleeves in the concrete sleeper or track slab are arranged symmetrically, which is convenient for the reinforcement design of the concrete sleeper or track slab.

h) No spare parts are required when adjusting the track direction and track gauge. It is achieved by moving the iron pad with oblong holes. It is a continuous stepless adjustment. The track direction and track gauge can be set and the operation is simple and convenient.

i) The height adjustment of the rail is large, which meets the use requirements of ballastless track. The filling pad under the rail can achieve stepless adjustment of the height.

j) This fastener does not require special spare parts when installed at the rail joint, and does not hinder the installation of the joint clamp.

Product Optimization

In view of the key technical problems that the fastener system of the ballastless track of the passenger dedicated line needs to solve, such as high elasticity, high insulation, strong structural versatility, small pressure attenuation of the spring clip and high fatigue strength, reliable connection with the foundation, and large adjustment of the height and left and right positions of the rails, the following optimization improvements have been made in the research of this fastener system:

1) Improve the versatility of the fastener structure;
2) Improve the insulation performance of the fastener system;
3) Reduce the pressure attenuation of the spring clip and improve its fatigue strength;
4) Improve the reliability of the connection between the fastener system and the foundation;
5) Reduce the stiffness of the fastener system;
6 ) Improve the reliability of T-bolt fixation in the iron pad

Installation Steps Of WJ-7 Fastener System

Step 1: Place the rail pad:
Clean the mud on the rail-bearing surface of the iron pad, and place the rail pad on the rail-bearing surface of the iron pad in the correct direction.

Step 2: Place the rail
Clean the mud on the upper and lower surfaces of the rail bottom, and place the rail in the middle of the rail pad.

Step 3: Place the insulation block
Place the No. 9 insulation block between the rail and the iron pad shoulder. Do not knock it violently to make it fit. The contact surface between the insulation block and the rail should be close. If the gap between the insulating block and the shoulder of the iron pad is greater than 1mm, it should be replaced with a No. 10 insulating block.

Step 4: Place the T-bolt
Apply oil to the threaded part of the T-bolt and then place it.

Step 5: Place the spring bar
Place the two supporting points at the rear end of the spring bar in the grooves on the two supporting platforms of the iron pad, and buckle the insulating block at the front end.

Step 6: Place the flat washer and nut to tighten the spring bar
Place the flat washer and nut, lift the T-bolt, tighten the nut by hand (the nut and the bolt should be aligned, and do not tighten it obliquely), confirm that the bolt is vertical, and then tighten the nut with a torque-controlled wrench or machine to install the spring bar in place.

Step 7: Tighten the anchor bolt
After confirming that the track gauge and track direction are appropriate, use a torque-controlled wrench or machine to tighten the anchor bolt with a torque of 300~-350 Nm.

Why Choose Gnee Rail Fasteners?

As a world-leading manufacturer of rail fastener systems, Gnee Rail Fasteners has 18 years of professional experience, an annual production capacity of 10 million sets, and its products are exported to more than 60 countries. We have built 5 production bases, equipped with 400 technicians, and annual R&D investment exceeds 5% of revenue.

Our products have been used in more than 2,000 railway projects, with a total of 50,000 kilometers of track laid, covering more than 100 high-speed rail projects. From -40℃ to 80℃, the product performance remains stable and reliable. With strict quality control and professional technical support, more than 85% of our customers maintain long-term cooperation with us, and customer satisfaction continues to remain above 93 points.

Professional packaging

  • Adopting 5-layer reinforced protective packaging system, moisture-proof performance reaches 99%
  • Each box load-bearing test reaches more than 1000kg
  • Unique shockproof lining can reduce 90% of transportation vibration
  • Each product is equipped with RFID smart traceability label, which can be traced 24 hours a day

Strict product testing and inspection

  • Possessing 8 international certifications including ISO9001
  • Testing equipment with an accuracy of 0.001mm
  • Fatigue testing with over 3 million cycles
  • Annual testing capacity with over 5 million sets of fasteners
  • All products are 100% non-destructively tested with X-rays

Rich successful cooperation cases

  • Established partnerships with railway companies in more than 60 countries
  • Annual average repeat order rate reaches 85%
  • Customer satisfaction survey score is more than 93 points
  • The longest partnership lasts more than 15 years

Adequate inventory guarantee

  • The standing inventory is maintained at more than 3 million sets.
  • 48-hour fast delivery service for spot goods.
  • The storage area is 20,000 square meters.
  • The inventory turnover rate is controlled at 45 days.
  • The ERP system monitors inventory in real time with an accuracy rate of 99.9%.

Wide range of global engineering applications

  • Products are used in more than 2,000 railway projects around the world
  • High-speed rail projects covering 35 countries
  • Cumulative track mileage exceeds 50,000 kilometers
  • Product service life is more than 18 years
  • 24/7 global technical support team, response time <2 hours

Related Products

Contact Us